Manufacturing
|CS.116
IEC 62443 audit of a new chemical plant
IEC 62443 audit of OT security at a new polymer plant: zones, target security levels, on-site verification and a remediation plan.
Client
European chemical producer building a new polymer plant
Challenge
A European chemical producer was building a new polymer plant. It needed an independent assessment of whether the security measures in the plant's OT systems met the requirements of IEC 62443.
Approach
Security requirements
Zoning per IEC 62443, a target Security Level (SL) for each zone, scope agreed in a workshop with the client.
Audit activities
Verification of controls on an agreed sample of systems, configuration review of servers, operator stations and HMI panels, a site visit and scanning of OT network segments.
Report and remediation plan
Vulnerabilities mapped to IEC 62443 requirements with criticality ratings, an implementation order for the recommendations and a results session with stakeholders.
Results
We checked the OT security of a new plant against IEC 62443 and mapped the remediation plan to the standard's requirements.
The new plant has a zone model under IEC 62443 and a target security level (SL) for every zone.
Every vulnerability found is mapped to a specific IEC 62443 requirement and rated for severity, so it is clear which requirement each fix addresses.
The remediation plan sets the order of the recommendations by severity, and we reviewed the results with the client's stakeholders.
Planning a similar project?
30 minutes with a consultant who runs projects like yours. We agree the scope and tell you what the price depends on.
Related case studies
CS.108
OT asset inventory and IEC 62443 audit of a DCS
The audit confirmed that the new DCS can meet all IEC 62443 requirements for security level capability SL-C 1, and the client has configuration recommendations for 18 of them.